Valve Kit
$818.00
This valve kit includes the 4000PSI at 18GPM valves, o-rings, and seals, which is why it’s commonly referred to as a “complete rebuild” of the pump. This kit is usually required when:
- Pump is leaking behind the two manifold heads, or between manifold heads, or at the bolts
- Pump is cavitating
Anticipate needing one of these kits when the pump is leaking and the machine is around 800-1000 hours. Don’t replace if pump if isn’t leaking. This step should be taken before a complete manifold set (pump heads) rebuild is necessary.